Self performed the construction of the Canyon Ridge Bridge. Construction was required to meet TXDOT standards including a C411 concrete handrail system with integral colored concrete and lighting system.
NTMWD Bois D’Arc Lake – Operations Center
Tuttle House Apartments (LYND)